Kennett Tunnel Inspection

Project: Kennett Tunnel
Scope: Survey live water 2.5 metre tunnel
Location: Eley Ouse bulk transfer tunnel

Following a global search for a capable pipe inspection company, we were commissioned by the Environment Agency, Black & Veatch and Jackson Civils to inspect a 21km x 2.5m diameter bulk water transfer tunnel. There were only 3 useable access shafts, which varied in depth between 35m and 85m, with 1800mm square covers and a 10m drop to water level. The distance between the hatches varied between 3000m to 12400m. Duty pumping had to be maintained throughout the survey.

Our scope was to carry out a live visual/CCTV tunnel inspection to provide a full circumferential view of the pipe to facilitate pipe condition assessment which had to including hairline cracks, concrete segment displacement and tunnel ovality using profiling sonar. It was essential that recorded CCTV data had full resolution on playback with the capability of viewing key areas in fast forward, slow motion, with seamless pause, picture enlargement where required and the capability to screen dump specific images.

With no-proprietary equipment available we set about designing and building a self-propelled Pipe Inspection Vehicle (PIV), with an 11-camera configuration and profiling sonar, which was controlled and monitored via 10km of neutrally buoyant Micro-Fibre Optic cable, all within a 4-month window.

Share This Case Study, Choose Your Platform

After a global search, we identified Tunnel Vision as the leading company for remotely operated pipe inspections and were delighted to work with on the inspection of the Kennett Tunnel; a 21 km x 2.5m diameter raw water transfer tunnel owned and operated by the Environment Agency. Throughout the inspection, WSSG demonstrated their impressive technical capabilities in developing a bespoke unit capable of providing a full circumferential viewing with exceptional picture quality. They also demonstrated a real “can do” attitude, overcoming all the difficulties presented and pushing the boundary for the maximum distance surveyed on a single excursion to an impressive 10km. WSSG provided a thoroughly professional service and I would recommend them for tunnel/pipe inspections.”

FAQs

Frequently Asked Question

What made access particularly challenging on this project?

Only three usable shafts (35–85 m deep) with 1.8 m square covers and a 10 m drop to water level, plus hatch spacing from ~3 km to ~12.4 km.

An 11-camera custom PIV delivered 360° coverage with HD capture, while duty pumping continued throughout to avoid shutdowns.

High-resolution CCTV supported close review (fast-forward/slow-mo, frame-accurate pause, zoom/enlarge and screendumps) and profiling sonar was used to assess ovality.

A neutrally buoyant micro-fibre optic tether (≈10 km) carried control and data to the surface with stable handling in live flow.

The self-propelled PIV with 11-camera configuration and sonar was designed, built and commissioned within a four-month window.

Live visual/sonar condition assessment to capture hairline cracking, segment displacement and geometric deformation across a 21 km, 2.5 m diameter transfer tunnel.